Sector

Automotive injection molds

Trim, clips, covers and secondary parts — multi-cavity cold or hot runner, ABS/PP, visible-surface control. Nilüfer, Bursa.

ABS / PPtypical
4–8 cavitycommon
T0dims + surface
~90–240 tpress

What we do

  • DFM: draft, gate vestige, ejection, shut-offs
  • Tool: CNC/EDM, cooling, runner balance
  • T0: critical-dimension table and surface notes
  • Production or contract lots — process card

Related

Bursa injection molds · Appliances · Mold making · Tonnage guide

FAQ

Is PPAP / IATF required?

Only if the customer specification asks for it. Documentation scope is written in the quote.

Visible A-surface?

Gate and ejector marks are planned up front and approved on the T0 sample.

How long does a tool take?

Typical mold plus T0 is 4–8 weeks once the STEP is in. Quote reply is usually 1 business day (Mon–Sat).

Quote

STEP, volume, resin

Typical reply: 1 business day (Mon–Sat).