Sector
Automotive injection molds
Trim, clips, covers and secondary parts — multi-cavity cold or hot runner, ABS/PP, visible-surface control. Nilüfer, Bursa.
ABS / PPtypical
4–8 cavitycommon
T0dims + surface
~90–240 tpress
What we do
- DFM: draft, gate vestige, ejection, shut-offs
- Tool: CNC/EDM, cooling, runner balance
- T0: critical-dimension table and surface notes
- Production or contract lots — process card
Related
Bursa injection molds · Appliances · Mold making · Tonnage guide
FAQ
Is PPAP / IATF required?
Only if the customer specification asks for it. Documentation scope is written in the quote.
Visible A-surface?
Gate and ejector marks are planned up front and approved on the T0 sample.
How long does a tool take?
Typical mold plus T0 is 4–8 weeks once the STEP is in. Quote reply is usually 1 business day (Mon–Sat).
Quote
STEP, volume, resin
Typical reply: 1 business day (Mon–Sat).
