Guide

Tonnage & cost guide

Orientation only — firm pricing comes after a STEP review.

Press

Typical tonnage band

Yizumi line ~90–240 t; projected area and resin decide.

ClassExample partsNote
~90–130 tSmall clips, thin lidsShort cycle, multi-cavity possible
~130–180 tMid housings, trimMost common band
~180–240 tLarger covers / grillesWatch fill and warpage

Quote

What drives cost?

01

Cavities

Single vs multi — tool ↑, piece ↓.

02

Hot / cold

Hot runner CapEx ↑, scrap ↓.

03

Steel / detail

H13, slides, unscrew, EDM density.

04

Volume & resin

PA+GF / PC drying and cycle.