Cases

Case studies

Client names withheld — process and outcome summaries. Detail under NDA.

2sample paths
Anonymousno names
T0approved path
NDAdetail available

01 · Automotive supplier

Trim clip — 4-cavity cold runner

Part: ABS trim clip. Target: ~80k/year. Lead time: DFM 3 days → tool ~5 weeks → T0 in 2 loops → series.

  • Draft and ejection locked in DFM
  • Cold runner (scrap acceptable)
  • T0: 3 critical dims + surface sign-off
  • Process card for contract lots

02 · Technical housing

PA+GF connector body with insert

Part: PA6 GF30 body, brass insert. Target: low volume, tight dims. Lead time: FDM fit 4 days → tool ~6 weeks → T0 in 3 loops (insert fit).

  • FDM assembly check first
  • CNC insert pocket + EDM detail
  • Cooling revision for moisture/warpage
  • Approved T0 then small lots

Quote

Send a STEP

Examples show the path — your part gets a clear quote.